Put mouse cursor on scrolling image below to scroll right, left or stop..

Click here for 360 degree image

 

Architecturally designed buildings with extensive concrete docks and pads were designed for conversion to a winery. There is a concrete sloped floor with drainage. There is 3 phase electric service and water for the buildings. The buildings have aluminum interior and exterior siding.

There are 3 buildings, Building 1 is 40’x72’ and divided into 2 connecting rooms. Building 2 is 40’x76’ and Building 3 is 40’x100’. All are 14’ high. The floors are all concrete to carry the load of a forklift and product.  2-25 hp. and 5-10 hp. compressors drive the air cooling equipment.

The concrete pad connecting the north and south building is suitable for a grape receiving press deck. The temperature controlled buildings are excellent for the winemaking process and finished case goods. There is 4000 sq. ft. of loading dock and a sealed loading dock designed for a tractor trailer.

 

 

There are 2 Ford tractors, 1 David Brown tractor, and all the necessary vineyard implements such as sprayers, mowers, discs, and post driver. Also included is a 1990 Ford 22’ refrigerated truck and 2 Hyster forklifts.